RTM Turbo Mill Scientific Operation and Maintenance

Date:2021-08-18 10:33:56 | Views:

Hello everyone! Welcome to watch this article! I am RTM Turbo Mill. I am very happy to share our RTM Turbo Mill scientific operation and maintenance with you.

RTM Turbo Mill Accurate Operations and Scientific Maintenance
First. RTM Turbo Mill Prepare
1. Check the host, connect, pipe, pipe, valve, etc. before startup. It is a certain situation.

Second. Set the frequency and bandwidth of the pulse controller to ensure smooth flow of the filter bag. Second, open RTM Turbo Mill
1. Open and output the cooling valve before opening the RTM Turbo Mill and the freeze dryer, ensuring the normal flow of the cooling water.
2. The start operation of the compressor should be performed according to the instruction of the compressor.
3. The pressure regulator of the compressor can adjust the pressure of the tank to make the pressure greater than the pressure of the 0.1 MPa.
4. Open the freeze dryer and confirm the pressure to meet the requirements.
5. Open the shaft cleaning valve and air sealing valve, adjust the pressure of 0.1 to 0.3 MPa, then start the classification wheel, and adjust the required speed from zero from zero through the drive.
 6. Turn off the fan control valve, open the blower, then gradually open the intake valve of the blower and adjust the desired air volume.
7. When the crushed pressure reaches 0.8 MPa, turn on the main valve; open the spray valve, the pressure of the anti-blowing valve reaches 04-0.6MPa, then open the whirlwind separator and the hydrophobic valve, one to remove the valve.
8. When loading, pay attention to the control position, check whether the current limit value of the hierarchy impeller meets the requirements. If not, it should be reset.

Third, the RTM Turbo Mill operating procedure system adopts advanced PLC + touch screen control mode, and the terminal touch screen is the system's operation. Therefore, it is very important to properly grasp all key features and systems of the screen.

Forth. Turn off RTM Turbo Mill

1. Stop the spiral feeder.
2. Turn off the main valve and stop the compressor.
3. Turn off the fan inlet valve and stop the fan.
4. Stop the grading impeller motor, close the cleaning valve and sealing valve. 5. Stop the cyclone separator and the hydrophobic valve discharge valve.
6. Turn off the control box after downtime.

RTM Turbo Mill Precautions
1. When the unloader is made, it is strictly forbidden to extend the hand into the outlet of the unloader to avoid huckle.
2. The hierarchical impeller speed cannot exceed the specified value, otherwise it will damage the grading wheel andMotor.
3. The safety valve must be checked regularly. Sixth,

RTM Turbo Mill Maintenance and Maintenance
1. Operation and Maintenance of Fan. The dust in the fan is cleaned once a week, especially dust and dust on the scraper. Add lubricating oil (2 calcium sodium sodium grease) per month in the bearing box. The fan is in the process of stopping, and if there is abnormal sound or the body vibration in the fan, it should stop the check.
2. The hosted of the wear of grading impeller, spiral feeder and grinding nozzles every twelfth month. After 200 ~ 300 hours, the powder is adhered to the nozzle, the grinding the indoor wall and the grading wheel must be cleaned to prevent crushing and grading effect. When the pulse valve works normally 200 ~ 300 hours, the filter bag must be cleaned or replaced. Motor bearing lubrication grade. After running 2000 hours, a disulfide molybdenum gland should be appropriately added. The amount of grease is not too much, otherwise the bearing temperature will rise.
3. Planetary emission valve In the machine operation, if the abnormal sound is found, the check should be stopped immediately. Clean an impeller and an inner box every three months. Add a 00 ounce of extreme pressure lithium based grease every three months.
4. The operation and maintenance solenoid valve of the pulse bag filter is poor, and every three months check once and clean the dust. Check the condition of the filter bag and replace each six months. If the ventilator is exported, check whether the filter bag is damaged or damaged. Whether the frame presses loose, the gasket is aging, and replaced. Pulse controllers and solenoid valves can be inspected normally before starting the machine.
5. The control cabinet control cabinet should pay attention to dust, and strictly use the control cabinet door to prevent dust from entering. Clean dust every half a month to prevent contact with poor contact.

To learn more about RTM Turbo Mill, you will go to Shandong AlPa Powder Technology Co., Ltd., the company has produced RTM Turbo Mill and RTM Turbo Mill products, quality multiplication, and is very trustworthy.

Recommended news

DISC JET MILL of Artificial Graphite

DISC JET MILL of Artificial Graphite This product technology has received extensive attention from the industry. The abrasive mechanism of Disc Jet Mill of Art

Details >>

Air Classifier Mill for PANTOPRAZOLE

Currently, Air Classifier Mill for Pantoprazole has gradually entered people's lives, more and more plants, and companies are using the equipment. The main a

Details >>

Air Classifier Mill for Valsartan

With the development of society and life, the demand for Air Classifier Mill for Valsartan is getting bigger and higher in the industry, and the requirements f

Details >>

Spiral Jet Crusher Of Garlic Stalks

With the demand of society, the demand for Spiral Jet Crusher's Garlic Stalks is getting bigger and higher in the industry, and the requirements for fineness,

Details >>
hotline

Online consultation

email

Email