In fact, the author thinks that many additives are still ok, some are pure natural, like the equipment we do to an additive factory, people are natural, and they are all exported, and there are very few domestic products. Mage!
The production capacity of the selected pulverizer is slightly larger than the actual production capacity, avoiding the production capacity of hammer wear, air-stop wind, etc., does not affect the continuous production supply of the feed. SF-300 high-speed Jet Mill, it is a crushing equipment. For us, it is also an object of our study, so let's take a simple introduction and explanation of this crusher, I hope to let Everyone can understand other types of crushers while understanding Jet Mill.
In order to meet the development of information technology, biotechnology and new material technology to the particle size, purity and particle size distribution of powder products, ultrafine gas flow crushing technology research should be improved, optimized, optimized ultrafine gas flow Equipment, develop new equipment, and pay attention to the matching design of smash and classification system.
Amount method: The pharmaceutical factory can select the high-speed mixer model you need in accordance with the model of the peer manufacturer. This method has the advantage of convenient convenience, the choice of investment has less investment, and less mistakes. But the primary condition is to master the side of the person who is selection, it is difficult, once the chart of mistakes, the selection will go. Because the powder high-speed mixer amplification factor data is very small, Therefore, the trial needs to be closely fitted to the equipment factory, but also on the problem of mixing uniformity, power change, mixing time, and mixing start.
There is only one of the proposal results to be consistent with the small test results. There is a reliable basis; the National Power Industry Dust Control and Dust Requirements: From 1996, since 1996, the post-dust concentration of the workplaces reached more than 90%; due to the Lavar nozzle and the pulverized cavity installation In an acute angle, the high-speed jet flows in the pulverizing cavity to circulate, between the particles and the particles and the fixed target wall surface produce mutual impact, collision, and rubbing. In general, the order of parking is: blocking the grading machine back sink - stopping water - waiting until all of the grooves in the groove is finished, press the stop button parking - put the spiral portion to the mine surface.
Due to manufacturing errors and motor characteristics, the power of each drive point will become uneven, once a motor power is too general
The power balance between each motor should be controlled and the balance accuracy is improved.