The correct use of the crusher!

Date:2021-08-30 17:43:45 | Views:

Today's Crusher's Shanghai's Shandong Alpa Powder Technology Co., Ltd. comes with you to talk about the correct usage of the crusher!

1. The comminution fixation should be fixed on the cement. If you often transform your working place, the pulverizer is installed on the base made with angle iron. If the pulverizer is powered by diesel engine, the power of the two should be matched, i.e., the diesel power is slightly greater than the pulverizer power, and the belt wheel groove of the two is consistent. The outer end of the leather belt is on the same plane.

2. You must check if the part of the connecting bolts in the unit is fastened before booting, whether the looseness of the drive belt is suitable, whether the power cord is good. Whether the motor shaft and the pulveroid shaft are parallel.

3, check if the hammer is good, whether the aperture of the screen is suitable, and there is no damage. Drag the belt with hands, check if the spindle rotation is flexible, there is no card, and it hits the friction.

4, after boot, first turn the equipment for 2-3 minutes, check whether the rotor turns is correct, whether the sound is normal. Only after the rated speed is smooth, it can work.

5. At any time, you should pay attention to the operation of the crusher. The feed should be uniform, to prevent blocking, do not have a long time overload. If there is a vibration, noise, the bearing and the body temperature is too high, the outer spray, etc., should be immediately stopped, and the fault can continue to work.

6, the pulverized material should be carefully examined, there is no foreign matter such as stone, metal, so as not to damage the machine.

7. When the machine is running, the operator shall not leave the unit, and shall not remove the working conditions in the pulverization room in the operation, and the maintenance tool shall not be placed on the machine or filler.

8. When the operator does not wear gloves, when blocking occurs, it is strictly forbidden to extend the hand into the fill, and should stand on the side of the pulverizer to prevent rebound debris.

9. Do not stop immediately after work, it should be idled for 2-3 minutes to make it completely discharged in the machine. Cleaning and maintenance work should be made after stopping.

10, the hammer is the main loss case, after wear, whether orientable in the same direction or the needle to change the angular angle to change the whole group of hammers simultaneously, when replacing the new hammer, the whole hammer is also replaced at the same time, and cannot use a single hammer Submit old. Sieves are also easy to lose parts, such as partial sieves damage, can be riveted, and severe damage is required to replace new screens.

11. After 300 hours of crushing machine, to clean the bearing and replace the oil.

When parking for a long time, you should remove the belt.The above is one of the crusher manufacturers of Shandong Alpa Powder Technology Co., Ltd., the correct usage of the crusher, more about crusher consultation, please continue to pay attention to the ALPA powder official website!

Recommended news

DISC JET MILL of Artificial Graphite

DISC JET MILL of Artificial Graphite This product technology has received extensive attention from the industry. The abrasive mechanism of Disc Jet Mill of Art

Details >>

Air Classifier Mill for PANTOPRAZOLE

Currently, Air Classifier Mill for Pantoprazole has gradually entered people's lives, more and more plants, and companies are using the equipment. The main a

Details >>

Air Classifier Mill for Valsartan

With the development of society and life, the demand for Air Classifier Mill for Valsartan is getting bigger and higher in the industry, and the requirements f

Details >>

Spiral Jet Crusher Of Garlic Stalks

With the demand of society, the demand for Spiral Jet Crusher's Garlic Stalks is getting bigger and higher in the industry, and the requirements for fineness,

Details >>
hotline

Online consultation

email

Email